Industrial Land Opportunity · Terrace, BC

Strategic industrial land at the crossroads of Northwest BC

16.85 acres across four contiguous parcels on Jack Talstra Way — positioned between the deep-sea ports of Prince Rupert and Kitimat, near the Highway 16 corridor and the regional CN Rail mainline. Available for laydown, warehousing, and office/warehouse bays. Lease or build-to-suit.

Regional Connectivity Map — Talstra Lands, Terrace BC Schematic map showing Terrace as the hub with routes to Prince Rupert (137 km west), Kitimat (64 km southwest), Prince George (575 km east), the Northwest Regional Airport (adjacent), and CN Rail (~10 km). Not to scale. 137 km 64 km 575 km TERRACE Talstra Lands Prince Rupert Port · CN Rail Port · LNG Kitimat Prince George Hwy 16 · CN Rail Airport CN Rail ~10 km Hwy 37 N
Schematic · not to scale
Regional Connectivity Highway CN Rail
16.85 ac
Total Area
4
Contiguous Parcels
137 km
to Prince Rupert
64 km
to Kitimat
M2 / M4
Industrial Zoning
The Opportunity

Industrial land where the supply chain actually runs

Terrace is the service and supply centre for Northwestern British Columbia — the staging ground for the region's LNG exports, mining operations, port logistics, and heavy industrial construction. The Talstra Lands put 16.85 acres of contiguous, divisible industrial land directly in that corridor.

Four parcels on Jack Talstra Way can be leased individually or together, for land lease, laydown and storage yards, warehousing, or build-to-suit office/warehouse bays. The site sits minutes from the Northwest Regional Airport and the broader Terrace industrial area, with Highway 16 and CN Rail moving hundreds of Class 8 trucks and rail cars through the region every week.

Parcel details Inquire about leasing
Location & Logistics

A regional connectivity hub

Terrace sits at the intersection of two highways, a Class-1 rail line, and two deep-sea ports — the logistics backbone of Northwest BC.

Port of Prince Rupert

Canada's third-largest container terminal and closest deep-sea port to Asia — 137 km west by uncongested highway. Ice-free, deep-water, with direct CN Rail service. The fastest North American ocean route to Asian markets.

137 kmDeep-seaCN Rail

Port of Kitimat

Home to the Rio Tinto aluminum smelter and the terminus of the Coastal GasLink pipeline — 64 km south. LNG Canada's export terminal is operational here, with Phase 2 expansion proposed to double capacity to 28 mtpa.

64 kmLNGSmelter

CN Rail Mainline

The CN mainline runs approximately 10 km from the site — BC's fastest port-to-US rail connection. The Kitsukalum First Nation is developing a break-bulk and intermodal transload facility approximately 15 km away.

~10 kmClass-1 railTransload

Highway 16 & 37

The Trans-Canada Highway 16 runs east–west through Terrace, connecting to Prince George (575 km east). Highway 37 connects north to the Alaska Highway and south to the Lakelse Lake region.

Hwy 16Hwy 37Trans-Canada

Northwest Regional Airport

Immediately adjacent to the Talstra Lands, serving Terrace and Kitimat. Offers airside and groundside commercial land and hangar opportunities for aviation-supportive industrial uses.

AdjacentAirside land

Prince George & Inland Hub

575 km east on Highway 16, Prince George is the regional supply centre for Central and Northern BC — connecting Terrace to the broader provincial distribution network and CN Rail's transcontinental route.

575 kmSupply hub

Distances and infrastructure details drawn from the City of Terrace — Skeena Industrial Development Park brochure.

The Parcels

Four contiguous parcels, individually or together

16.85 acres across four M2/M4-zoned parcels on Jack Talstra Way — lease one, several, or all.

Parcel Diagram — Talstra Lands (Plan EPP91844) Schematic diagram of four lots (A, B, C, D) showing boundary dimensions in meters and feet. Lot A: 2.76 ha / 6.82 ac. Lot B: 2.23 ha / 5.51 ac. Lot C: 1.03 ha / 2.55 ac. Lot D: 0.796 ha / 1.97 ac. Total: 16.85 acres. HIGHWAY 37 PARK BC HYDRO R/W PNG R/W LOT A 2.76 ha 6.82 ac 27,600 m² / 297,084 ft² 3840 Jack Talstra Way PID 030-917-433 M2 Heavy Industrial 331.7 m / 1,088.3 ft 323.5 m / 1,061.4 ft 137.4 m / 450.7 ft LOT B 2.23 ha / 5.51 ac 3800 JT Way · PID 030-917-441 · M2 137.5 m / 451.2 ft LOT C 1.03 ha 2.55 ac 10,300 m² 110,868 ft² 3760 JT Way PID 030-917-450 M4 · C3 pending 74.1 m / 243.2 ft 139.3 m / 457.0 ft 65.2 m / 213.8 ft 45.3 m / 148.5 ft LOT D 0.796 ha 1.97 ac 7,960 m² 85,681 ft² 3740 JT Way PID 030-917-468 M4 · C3 pending 80.7 m / 264.6 ft 92.7 m / 304.1 ft 96.8 m / 317.7 ft JACK TALSTRA WAY TOTAL: 16.85 ac 6.816 ha / 68,160 m² Schematic — not to scale. Dimensions from Plan EPP91844 (McElhanney, 2019). Surveyor: Todd E. Basky, BCLS 899. Filed 2019-10-02.
Lot Address Area PID Zoning Suitable Use
A 3840 Jack Talstra Way 6.82 ac 030-917-433 M2 Heavy Industrial Laydown yard, warehousing, build-to-suit
B 3800 Jack Talstra Way 5.51 ac 030-917-441 M2 Heavy Industrial Laydown yard, warehousing
C 3760 Jack Talstra Way 2.55 ac 030-917-450 M4 Light Industrial Office/warehouse bays, light assembly
D 3740 Jack Talstra Way 1.97 ac 030-917-468 M4 Light Industrial Office/warehouse bays, light assembly

All four parcels carry M2/M4 industrial zoning. Lots C and D are also subject to a separate C3 Service Commercial rezoning application under review for potential hotel/service-commercial use. Approval is not guaranteed. All parcels are under Plan EPP91844.

Use Cases & Tenant Fit

Built for the way Northwest BC industry operates

The parcels are suited to a range of industrial and logistics uses — lease land, build to suit, or stage your operation.

Laydown Yards

Fenced, secured storage for pipe, structural steel, heavy equipment, and project materials — serving LNG, mining, and construction supply chains.

M26.82 + 5.51 ac available

Warehousing & Distribution

Dry storage for regional distribution, parts inventory, and supply-chain staging — with direct highway and rail access.

M2 / M4Build-to-suit

Office / Warehouse Bays

Lighter-format industrial space for service companies, contractors, and trades — office and shop space in one bay.

M42.55 + 1.97 ac

Fleet & Class 8 Servicing

Truck parking, maintenance bays, and wash facilities for the hundreds of Class 8 trucks moving through Terrace weekly.

M2Highway 16 access

LNG & Mining Supply

Staging ground for LNG Canada, Coastal GasLink, and Golden Triangle mining operations — fabrication, assembly, and supply.

M264 km to Kitimat

Build-to-Suit

Lease the land and we'll work with you to design and build a facility tailored to your operation — or bring your own builder.

All parcelsFlexible terms
Regional Infrastructure

Utilities & servicing context

Regional utility infrastructure serving the broader Terrace industrial area. Site-specific connections to be confirmed during diligence.

BC Hydro
500 kV transmission line and 2,500V 3-phase distribution available in the regional industrial area. A BC Hydro substation is approximately 3 km from the Skeena Industrial Development Park.
Pacific Northern Gas
A 10-inch natural gas pipeline runs along the southeast edge of the broader industrial area, currently operating at approximately 20% capacity.
Telus Fibre
High-speed fibre-optic telecommunications infrastructure is available in the Terrace area.
Water & Site Servicing
Municipal water has been announced for the area, with availability estimated for early 2028. Well water is common in the interim; site-specific connection and servicing to be confirmed during diligence.

Regional utility information is drawn from the City of Terrace SIDP brochure and describes the broader Terrace industrial area, not parcel-specific connections.

Why Terrace

The demand engine behind the land

Terrace is the supply and service hub for one of Canada's most active industrial corridors — LNG exports, mining, port logistics, and heavy construction.

LNG Canada
Canada's first LNG export terminal
Canada's first LNG export terminal at Kitimat (~64 km). Phase 2 would double capacity to 28 mtpa — a proposed ~$30–33B expansion targeting a 2026 FID.
2 ports
Prince Rupert & Kitimat
Two deep-sea ports within 137 km. Prince Rupert is Canada's closest port to Asia; Kitimat hosts LNG Canada and the Rio Tinto smelter.
Golden Triangle
BC's richest mining district
One of the world's most prolific mineral districts — operating mines (Brucejack, Red Chris) and major proposed projects (KSM, Galore Creek) drive sustained demand for industrial land.
$6B
Rio Tinto Kitimat smelter
The Rio Tinto aluminum smelter at Kitimat underwent a $6 billion modernization — one of the largest private investments in BC history.
CN Rail
Fastest port-to-heartland rail
CN Rail provides the fastest rail connection from a BC port to the US Midwest and Ontario — the transcontinental backbone for the region's export economy.
Cedar & Ksi Lisims
Next-wave LNG projects
The Haisla-led Cedar LNG and the Nisga'a-led Ksi Lisims LNG (~$10B) projects extend the region's export pipeline.

Major Regional Projects

Billions in committed and proposed capital within the Northwest BC industrial corridor — the demand engine behind laydown, warehousing, and servicing needs in the Terrace area.

Project Sector Status Capital / Value
LNG Canada — Phase 1 LNG export Operational ~$40B CAD (incl. Coastal GasLink)
LNG Canada — Phase 2 LNG export Proposed — FID targeted 2026 ~$30–33B CAD (doubles capacity to 28 mtpa)
Coastal GasLink Pipeline Gas transmission Operational ~$14.5B CAD
Cedar LNG LNG export Approved Haisla Nation–Pembina partnership
Ksi Lisims LNG LNG export Proposed ~$10B CAD (Nisga'a Nation)
Rio Tinto Kitimat Smelter Aluminum Operating (modernized) $6B modernization
KSM Mine Copper-gold Proposed ~$5.2B initial capital
Galore Creek Mine Copper-gold-silver Proposed (prefeasibility) ~$5.2B CAD capital estimate
Brucejack Mine Gold-silver Operating $3.5B (Newcrest acquisition)
Red Chris Block Cave Copper-gold DFS — FID 2026 $500M federal commitment (+1,800 jobs)
Schaft Creek Copper-moly-gold Prefeasibility (Teck 75%)
Tatogga / Saddle North Copper-gold Exploration (Newmont) $456M (GT Gold acquisition)

Source: City of Terrace — SIDP brochure; Government of Canada — Major Projects Office; Newmont; Teck Resources; BC Geological Survey. Capital figures are from publicly reported sources and are subject to change.

FAQ

Frequently asked questions

Key details about the parcels, zoning, utilities, and leasing options.

What uses are suitable for Talstra Lands?

The parcels are suited to laydown yards, warehousing and distribution, office/warehouse bays, fleet and Class 8 truck servicing, LNG and mining supply, and build-to-suit facilities. Lots A and B (M2) accommodate heavier industrial uses; Lots C and D (M4) are suited to lighter-format industrial.

What is the zoning of the parcels?

Lots A and B are zoned M2 Heavy Industrial. Lots C and D are zoned M4 Light Industrial. A separate C3 Service Commercial rezoning application is under review for Lots C and D — approval is not guaranteed, and they retain M4 zoning in the meantime.

How far is the site from Prince Rupert and Kitimat?

The site is 137 km from the Port of Prince Rupert (Canada's third-largest container terminal) and 64 km from the Port of Kitimat (LNG Canada, Rio Tinto smelter). CN Rail runs approximately 10 km from the site, and the Northwest Regional Airport is immediately adjacent.

Is municipal water available?

Municipal water has been announced for the area, with availability estimated for early 2028. Well water is common in the interim. Site-specific connection and servicing details to be confirmed during diligence.

Can parcels be leased individually?

Yes. The four parcels can be leased individually or together. Total area is 16.85 acres across four contiguous parcels on Jack Talstra Way — ranging from 1.97 to 6.82 acres each.

What is the status of the C3 rezoning for Lots C and D?

The C3 Service Commercial rezoning is an application under review by the City of Terrace. It is not an approval. Lots C and D retain their M4 Light Industrial zoning while the application is pending.

Now accepting leasing inquiries

Lease land, build to suit, or stage your operation at the crossroads of Northwest BC. Request the leasing package or arrange a site tour.

Contact

Let's talk about your requirements

Tell us about your operation and we'll follow up with parcel details, terms, and next steps.